Years in the Making
YEARS 01-03 2007 thru 2009
YEAR 04 - 2010
YEAR 05 - 2011
Clearing the Beast
Getting 'er Up
Utilities and Parking Spaces
Clearing the land was certainly a chore. Son JR and buddies Larry, and Dennis were instrumental in getting
the property ready for the build. A worker from Mousseau's camp helped a bit, but it was mostly the three of us...and several chainsaws!
Every foundational beam, bag of concrete, tool and piece of lumber was barged across open water, hauled up the rock bluff, and notched into place by the builders, whose only job was to construct the shell of the cabin...and that they did in just under 4 weeks! The rest would be finished by me, my family and buddies. Cabin shell finished in July, first trip up in August to get the exterior stained and prepped for winter.
The cabin is up and it survived the winter! Now the work begins to finish it up. In the spring, Dick Mansfield barged over the new docks and put them together, Dennis oversaw installation of handrails and balusters on the deck, we brought the living room furniture in, and Larry and I wired the cabin for power...which worked perfectly. The fall trip saw JR and I open with some of the family coming up, we installed the propane system and built a temporary outdoor shower fueled by a 5 gallon pail of warm water! Kitchen cabinets were also brought up, but install had to wait until next year.


Built to Weather Northern Winters
Every joint in the camp was engineered to endure heavy freeze cycles and northern gales. We chose local timber and heavy structural posts so the lodge would sit firmly against the shoreline for generations.
The cabin is entirely self-sufficient today. Power flows quietly from rooftop solar cells, while fresh lake water feeds filtered taps, preserving the pure silence of the Canadian woods.
A Haven Carved from the Woods
The cabin stands as a testament to patience, hard work, and good company on Sturgeon Lake.